Photo Gallery




  Image Gallery  
Dialog personnel rigged up on a drill pipe recovery job.
Dialog personnel rigged up on a drill pipe recovery job.Dialog operations cover Texas, Louisiana, Arkansas, Oklahoma, and New Mexico.Dialog has vast experience with pump down perforating operations in multiple shale basins.Dialog has experience with 5K, 10K, and 15K pressure control operations.Dialog pipe recovery engineers have on average 20+ years of wireline experience.Dialog pipe recovery trucks are fully equipped with gree point tools and pipe recovery equipment.The Dialog free point tools have proprietary modifications completed by our technician.Dialog trucks have 7/32, 9/32, 5/16, or 3/8 wireline depending on the application.Dialog operates one of the newest wireline fleets in the industry.Nobody gets hurt today represents the culture of safety at Dialog.An original THE DIA-LOG COMPANY truck.Dialog crew rigging up pipe recovery tools.Dialog truck rigged up on a tubing pipe recovery job.Dialog crane available with capacity up to 40 tons and boom height of 124 ft.



© 2010 Dialog Wireline, L.L.C. - All Rights Reserved